Structural work on Basement floors 1, 2 and 3 of Tower A of The Peak Towers is complete, along with all foundations. The lift core structure of Tower A is now complete up to the 2nd residential floor.

In Tower B, foundation works are 80% complete.  Concrete slab  work on the basement of Tower B is 30% complete. The lift core structure of Tower B is now complete up to the 2nd residential floor.