As high season approaches, Five Star Villas & Condos
are delighted to report that two major Heights Holdings developments -
Laguna Beach Resort 2 and C-View Residence - were awarded EIA approval in
October, with piling works at both developments commencing in November 2013.
Driven piling is now well underway at the Laguna Beach Resort 2 site just on
Thepprasit Soi 9 / Thepprasit Soi 17.
Piling machinery is set to mobilise at the C View Residence site on Pratumnak
Soi 4 by end-November.
Here is a construction update project-by-project.
C-View Boutique Condominium : The exterior
skeleton of C-View Boutique is now complete up to the rooftop, with structural
work complete on the rooftop area, including the swimming pool and
skeleton.
Interior wall brick work is in place up to the 6th floor,
whilst internal plastering works are up to the 5th floor. Installation of
gypsum ceilings is underway on floors 2 and 3.
Plastering work is well underway on the building exterior,
with electrical and plumbing systems in place up to the 4th floor.
Laguna Bay 2 : Laguna Bay 2 piling works are
complete, with all foundation work now complete.
Structural work on the building skeleton is up to the 3rd
floor, with structural work having commenced on the 2nd floor pool area above
the car park.
Work has commenced on the fitting of interior walls at
ground floor level.
Wong Amat Tower : Structural work on the Wong Amat
Tower is complete, with tiling now complete throughout the rooftop pool, and
the framework of the rooftop Jacuzzi now complete.
The ground floor pool structure is now complete, along with
structural work on the separate covered parking complex.
Architectural work has commenced on the lobby area and open
area seating lounge. Both main passenger elevators are now installed, whilst aluminum
window & balcony frames are in place in units up to the 25th
floor.
The Peak Towers : Structural
work on The Peak Towers - Tower A is now up to the 24th floor, with the Tower B
skeleton now up to the 18th floor.
Internal wall brick work for Tower A underway up to the 12th floor, with plastering
complete up to the 9th floor. Tower B interior walls are now set up to the 8th
floor.
Work is nearing completion on the new selection
of on-site show suites situated on the 9th floor of Tower A.
http://www.fivestarvillasandcondos.com/Property/The-Peak-Towers-2367
Laguna Beach Resort Jomtien : Interior
and exterior plastering throughout Building A of Laguna Beach Resort Jomtien
now stands at 90% complete, with installation of electrical and plumbing
fixtures in place across the majority of apartments.
The structural skeleton of Building B is now complete, with
interior walls in place up to the 6th floor. Structural work has now
commenced on the 3rd floor of LBRJ Building C.
Club Royal Phase 2 : Piling at Club Royal Phase 2
stand at 65% complete, with preparatory work for the foundations
underway.
The Waterpark Condominium : Piling is
complete at the Waterpark Condominium on Pratumnak Soi 5, with foundation work
at 10% complete.
Laguna Beach Resort 2 : Driven
piling machinery mobilised at the Laguna Beach Resort 2 site, off Jomtien 2nd
Road, on the 5th November 2013, following the resurfacing of the site entrance
for ease of access.
Installation of the two tower cranes is underway and piling work has commenced.
For further information on availability and prices please
call Robert on +66 8 1938 8391